EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

PUC of Texas Approves Entergy Texas' Plans to Build Over 1,200 MW of Gas-Fired Capacity

LCG, September 12, 2025--Entergy announced yesterday that the Public Utility Commission of Texas (PUCT) approved Entergy Texas’ proposal to build two efficient natural gas-fired power plants to support the region’s rapid growth. The combined electric generating capacity of the two facilities, the Legend Power Station and the Lone Star Power Station, will add over 1,200 MW to the Southeast Texas power grid to support new customer demand, increase reliability and lower costs for all customers. Both facilities are scheduled to commence operations by mid-2028.

Read more

Puget Sound Energy Starts Construction on 142-MW Appaloosa Solar Project in Washington

LCG, September 4, 2025--Puget Sound Energy (PSE) announced yesterday that phased construction has commenced on its 142-MW Appaloosa Solar Project, a utility-scale solar facility underway in southeastern Washington. The project is being built by Qcells EPC, who will serve as the module manufacturer and the engineering, procurement, and construction (EPC) solution provider. Construction is scheduled through 2026, and commercial operation is expected at the end of next year.

Read more

Industry News

PJM Capacity Rules Drive Mon Power to Evaluate Options for Bath County Pumped Storage Project

LCG, November 16, 2016--FirstEnergy Corp. subsidiary Mon Power Friday announced that it has initiated a review of its ownership stake in the Bath County Pumped Storage Project located in Warm Springs, Virginia. Mon Power's review is driven by recent changes in the PJM capacity market that are expected to reduce sharply its capacity revenues from the facility.

Mon Power has an indirect ownership interest in the pumped storage hydroelectric generating facility that includes a higher and lower reservoir and a powerhouse interconnected by tunnels. The powerhouse includes six pump-turbines that (i) generate power when water flows from the higher to the lower reservoir (and hourly power prices are relatively high) and (ii) consume power to pump water from the lower to upper reservoir (when power prices are relatively low, e.g., at night). Dominion Resources, Inc. subsidiary Virginia Electric and Power Company is the majority owner and operator of the facility, which has a total generating capacity of approximately 3,000 MW.

The new capacity rule for PJM, the regional transmission operator, is expected to reduce the value of pumped storage generation stations because they cannot produce electricity continuously during all hours of the day. Mon Power estimates that, under the new rules, its capacity revenues from Bath County will be roughly cut in half.

First Energy Corp. sold a number of hydro facilities in 2014, when it completed the sale of 11 other hydroelectric power stations to Harbor Hydro Holdings, LLC, a subsidiary of LS Power Equity Partners II, LP. The total capacity of those hydroelectric facilities was 527 MW, including the Seneca Pumped Storage Hydro Plant (451 MW), located in northwestern Pennsylvania.
Copyright © 2025 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service