EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

OG&E and Google Announce Contract for Three Data Centers in Oklahoma

LCG, April 30, 2026--OG&E, the operating subsidiary of OGE Energy Corp., announced today that it will power three new data centers that Google announced in Muskogee and Stillwater, Oklahoma last year. As part of the agreement, Google will also make power generation capacity available from two solar facilities in Stephens and Muskogee Counties that are currently under construction. The data centers and associated Electric Service Agreements are expected to provide economic growth for local communities and the state, contribute to grid stability, and benefit OG&E's current customers.

Read more

Graphic Packaging and NextEra Energy Resources Sign 250-MW Virtual Power Purchase Agreement

LCG, April 29, 2026--Graphic Packaging Holding Company today announced a virtual power purchase agreement (VPPA) with NextEra Energy Resources, LLC. With the VPPA agreement, NextEra Energy Resources plans to build the Selenite Springs Energy Center, a 250-MW solar energy facility in West Texas, and Graphic Packaging will be the sole buyer of the facility's renewable energy attribute certificates. Graphic Packaging, a global provider of sustainable consumer packaging, expects the agreement to cover approximately 43 percent of its 2025 electricity usage in the U.S. and Canada. The agreement will advance Graphic Packaging's commitment to source renewable electricity and reduce its greenhouse gas (GHG) emissions.

Read more

Industry News

MHI Vestas Upgrades Offshore Wind Turbine to 9 MW

LCG, January 27, 2017--MHI Vestas Offshore Wind yesterday announced that its uprated 8 MW wind turbine can reach 9 MW at specific site conditions. The company stated that its prototype V164 broke the energy generation record for a commercially available offshore wind turbine on December 1, 2016, when it produced 216,000 kWh over a 24-hour period at Østerild. The increased energy production per wind turbine will reduce energy costs.

The company's CTO stated, "We are confident that the 9 MW machine has now proven that it is ready for the market and we believe that our wind turbine will play an integral part in enabling the offshore industry to continue to drive down the cost of energy."

The 9 MW wind turbine is based on the V164-8.0 MW, a machine already installed at the 258 MW Burbo Bank Extension.

A recent report released by WindEurope concludes that offshore wind in Europe saw a net addition of 1,558 MW of installed grid-connected capacity in 2016, which was 48% less than in 2015, when capacity additions peaked. Europe now has a total installed offshore capacity of 12,631 MW. In spite of the drop in new capacity in 2016, WindEurope projects offshore wind capacity to nearly double to 24.6 GW by 2020.
Copyright © 2026 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service