EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

Oglethorpe Power Announces Selection of Kiewit Subsidiary as EPC Partner for New 1,425-MW Combined-cycle Facility in Georgia

LCG, January 13, 2026--Oglethorpe Power today announced it has selected Kiewit Corporation through its subsidiary, The Industrial Company (TIC), as the Engineering, Procurement and Construction (EPC) partner for its new combined-cycle (CC), natural gas-fired power plant in Monroe County, Georgia. The new, 1,425-MW facility represents a capital investment of more than $3 billion. Commercial operation of the new generation capacity is planned to commence in 2029.

Read more

Meta Announces Up to 6.6 GW of Nuclear Projects to Power American AI

LCG, January 9, 2026--Meta today announced new, landmark agreements that will (i) extend and expand the operation of three existing nuclear power plants and (ii) drive the development of advanced nuclear technology. Meta's new agreements with Vistra, TerraPower, and Oklo follow Meta's request for proposals (RFP) issued last month. Meta expects these projects to deliver up to 6.6 GW of new and existing clean nuclear energy by 2035.

Read more

Industry News

Coal-Fired Generation at the Intermountain Power Project to End in 2025

LCG, May 25, 2017--The owners of the Intermountain Power Project announced on May 23 that they will cease electricity generation fueled by coal in 2025. The decision is driven by the loss of existing customers, environmental regulatory issues, and competition from both gas-fired generation that benefits from low natural gas prices and growing renewable (wind and solar) capacity supported by state renewable portfolio standards (RPS's).

The Intermountain Power Project ("IPP") is located near Delta, Utah and began commercial operations in 1986. The electric generating facility includes a two-unit, 1,800-MW coal-fired station; two transmission systems; a microwave communication system and a railcar service center; all built as a joint undertaking by 36 utilities in Utah and California.

Nearly all of the electricity generated by the IPP has been delivered to six municipal power systems located in southern California, with the largest being Los Angeles Department of Water and Power (LAWDP). However, under California state law, these municipalities are now prohibited from purchasing coal-fueled electricity after their existing power purchase agreements (PPA's) expire.

"We are saddened to announce this decision, but factors beyond our control make continued operation of the coal units unfeasible after their current power purchase agreements expire," said the Board of Directors Chairman for Intermountain Power Agency ("IPA.") "We are mindful of the substantial economic contribution IPP makes to rural Utah and we will vigorously continue efforts we began years ago to diversify and provide project benefits for its employees and surrounding communities for as long as feasible."

IPP participants are preparing plans to develop new natural gas-fired electricity generation at the project site. Thirty-two municipal power systems and rural electric cooperatives have subscribed to participate in the gas project and engineering has begun. The project envisions about 1,200 MW of new natural gas-fueled electricity generation at the site that would become operational in 2025.

In addition to the new natural gas project under development, other energy projects have been attracted to the area by IPP's substantial infrastructure, according to the IPA. Over 300 MW of wind farms located in Millard and Beaver counties connect to the grid at the IPP's switchyard. Furthermore, salt dome caverns have been constructed immediately adjacent to IPP and are currently in operation for storage of natural gas liquids. Future cavern development could provide storage capacity for other materials, such as natural gas or other fuel products, or for compressed air energy storage (CAES).
Copyright © 2026 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service