EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

Avangrid and Puget Sound Energy Sign PPA, Including Upgrade and Life Extension, for Washington Wind Project

LCG, May 19, 2026--Avangrid, Inc., a member of the Iberdrola Group, today announced the signing of a long-term Power Purchase Agreement (PPA) with Puget Sound Energy (PSE) for the 199.5-MW Big Horn I wind project in Klickitat County, Washington. This agreement represents the fourth PPA executed by the two companies for projects in the Pacific Northwest.

Read more

DOE Acts to Ensure Key Coal-fired Power Plants Are Available in MISO to Supply Peak Summer Demands

LCG, May 18, 2026--The U.S. Secretary of Energy today issued an emergency order to address critical grid reliability issues in the Midwest anticipated this summer. The order is in effect beginning on May 19, 2026, through August 16, 2026. The emergency order directs the Midcontinent Independent System Operator (MISO), in coordination with Consumers Energy, to ensure that the J.H. Campbell coal-fired power plant (Campbell Plant) in West Olive, Michigan shall take all steps necessary to remain available to operate and to minimize costs for the region.

Read more

Industry News

Competitive Power Ventures Holds Groundbreaking Ceremony for the CPV Fairview Energy Center

LCG, October 27, 2017--Competitive Power Ventures (CPV), GE and Osaka Gas on Tuesday held the groundbreaking ceremony for the CPV Fairview Energy Center, a 1,050-MW, combined-cycle project located approximately 60 miles east of Pittsburgh. The electric generating station is scheduled to commence commercial operations in early 2020, and the estimated cost of the facility is a $700 million.

The CPV Fairview Energy Center will use two of GE's 7HA.02 gas turbines, a GE steam turbine, generators and additional controls equipment. The HA is GE's largest and most efficient gas turbine. GE states that the HA technology can deliver full power to the grid in less than 30 minutes. The CPV Fairview Energy Center will be unique in that it is designed to be fueled by a mix of natural gas and ethane. The facility will be built on a site that was previously used as a petroleum storage terminal and for salvage operation.

The CPV President and CEO stated, "The CPV Fairview Energy Center will help modernize the grid and improve electric reliability while reducing our environmental footprint and creating significant economic development in the region. We are grateful for our strong partnership with GE and Osaka Gas, as well as the support we have seen from state and local officials notably that of Jackson Township who has welcomed us with open arms into the community."
Copyright © 2026 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service