News
LCG, July 24, 2025--The U.S. Department of Energy (DOE) today announced the next steps in the Trump administration’s plan to accelerate the development of AI infrastructure by using Federal lands to lower energy costs and help power the global AI race, as previously outlined in President Trump’s Executive Orders on Accelerating Federal Permitting of Data Center Infrastructure, Deploying Advanced Nuclear Reactor Technologies for National Security, and Unleashing American Energy.
Read more
|
LCG, July 22, 2025--Enbridge Inc. (Enbridge) today announced that it has reached a final investment decision on the Clear Fork solar project located near San Antonio, Texas. Meta Platforms, Inc. (Meta), has signed a long-term contract for all of the renewable power generated from the 600-MW project.
Read more
|
|
|
Industry News
Presidential Permit Process Advances for Emera's Atlantic Link Transmission Project
LCG, December 6, 2017--Clean Power Northeast Development, a subsidiary of Emera Inc., has applied to the U.S. Department of Energy (DOE) for a Presidential Permit, requesting authorization to build the Atlantic Link subsea electric transmission project, a 1,000-MW, high-voltage direct current (HVDC) transmission interconnection extending approximately 375 miles to deliver wind and hydro power from Atlantic Canada directly to Massachusetts. The proposed in-service date is late 2022.
The Presidential Permit is required to authorize the transmission line project between the United States and Canada. Atlantic Link's application, filed September 28, 2017, was deemed complete, and the project's submission notice was published Monday in the U.S. Federal Register. The application initiates a formal review of the project by federal government agencies that will examine environmental impacts of the project and its impact on electric reliability.
Emera's Executive Vice-President for Major Renewables and Alternative Energy stated, "The request for a Presidential Permit is a significant milestone for Atlantic Link to ensure we continue to stay on track with our project schedule. Atlantic Link is a reliable, cost-effective solution to help Massachusetts meet its energy diversity and greenhouse gas emissions reduction goals. This transmission line's direct connection to Massachusetts will ensure benefits such as energy, taxes, construction activity and low income programs all stay with Massachusetts residents and electricity customers."
The Atlantic Link would directly deliver electricity to southeastern Massachusetts for a delivered price that remains fixed for 20 years. The subsea transmission project would extend from Coleson Cove, New Brunswick to Plymouth, Massachusetts, where it would return to land near the retiring Pilgrim nuclear station.
The project was proposed in response to the Massachusetts Clean Energy RFP, a competitive solicitation for clean energy delivery to the Commonwealth of Massachusetts. Responses to the RFP were submitted in late July.
Approximately 70 percent of the energy would be from seven proposed wind farms to be built in New Brunswick and Nova Scotia, with the remainder provided by two hydro suppliers in Atlantic Canada: Nalcor Energy and NB Power. The energy supplies resulted from a solicitation process initiated by Clean Power Northeast Development in January 2017. Commercial arrangements are in place between Clean Power Northeast and the selected wind and hydro suppliers.
Atlantic Link is 100 percent owned by Clean Power Northeast Development. NB Power holds an option to participate in the Atlantic Link project as a minority investor.
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|