News
LCG, March 31, 2025--Dow and X-Energy Reactor Company, LLC ("X-energy") today announced the submission of a construction permit application to the U.S. Nuclear Regulatory Commission ("NRC") for a proposed advanced nuclear project in Seadrift, Texas. The proposed advanced small modular reactor ("SMR") project could begin construction later this decade and commence operations early next decade.
Read more
|
LCG, March 27, 2025--Avangrid, Inc., a member of the Iberdrola Group, today announced that its True North Solar project, located in Falls County, Texas, has achieved commercial operation. The True North Solar project will deliver electricity into ERCOT and support Meta's operations, including Meta's upcoming data center in neighboring Temple, its second data center in Texas.
Read more
|
|
|
Press Release
ERCOT 2018 Summer Quarter Outlook
LCG, July 16, 2018-- LCG released a new third quarter (July – August 2018) report that looks at how the ERCOT grid can cope with strained network conditions. Resource adequacy analysis for the region is especially important during extreme summer loading conditions. This summer the network is under particular scrutiny as the reserves have tightened because of recent retirements.
This report examines a Base Case, a High Generation Outage Case, a Low Wind Case and a High Load Case. It discusses which strained conditions might shift in the outlook for energy prices, Operating Reserve Demand Curve (ORDC), Peaker Net Margin (PNM), and congestion.
LCG performed this study using hourly dispatch and its proprietary UPLAN Network Power Model. LCG has been modeling energy systems for more than 30 years and continuously sustains the most up-to-date information on every detail of the Texas grid, from minor and major transmission upgrades to gas prices and weather patterns.
If you are interested in receiving the full summer quarter outlook, please contact us at julie.chien@energyonline.com. For more in depth analysis, LCG can provide tailored datasets, such as individualized generator performance, hourly prices, and much more.
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|